SPS
SPS Technical Questionnaire
Requirement sheet for spark plasma sintering projects, including temperature, pressure, die size, and material information.
questionnaire | English
Download FileDownloads
Use these documents to prepare material, atmosphere, temperature, pressure, chamber size, and capacity information before requesting a technical proposal.
Public templates are planning aids, not certified machine specifications or signed acceptance records. Project values remain subject to technical review.
SPS
Requirement sheet for spark plasma sintering projects, including temperature, pressure, die size, and material information.
questionnaire | English
Download FileHot Pressing
Configuration checklist for chamber size, load, atmosphere, tooling, and process expectations.
technical document
Request DatasheetVacuum Furnace
Configuration sheet for vacuum level, hot-zone material, atmosphere, workpiece size, and heat treatment process.
technical document
Request DatasheetGas Pressure
Requirement checklist for ceramic sintering projects, including gas type, pressure range, temperature, and safety configuration.
technical document
Request DatasheetHIP
Technical intake sheet for hot isostatic pressing projects, including material, pressure, chamber size, and batch expectations.
technical document
Request DatasheetDiffusion Welding
Project brief for vacuum diffusion bonding, including material stack, bonding area, pressure, temperature, and fixture requirements.
technical document
Request DatasheetAll Series
Public guide for selecting an initial furnace family from process, atmosphere, pressure, work-zone, and development-stage requirements.
selection-guide | English
Download FileProject Planning
Site-readiness template covering access, electrical supply, cooling, exhaust, gases, vacuum interfaces, and handover planning.
checklist | English
Download FileEvidence
Sample acceptance framework for requirement baselines, factory and site checks, recorded channels, deviations, and sign-off.
sample-package | English
Download FileEvidence
Planning checklist for technical, operating, safety, acceptance, maintenance, and service documents.
checklist | English
Download FileCompany
Overview of Haoyue's thermal equipment families and the engineering inputs used for an initial selection review.
company-profile | English
Download FileResponse timing is confirmed after scope review.